Kitchen Remodeling in Los Gatos, CA
Los Gatos kitchens range from historic homes near downtown to hillside houses with views worth opening up to. The permit path depends on what changes: a kitchen that keeps its walls can move quickly, while one that opens up or changes the exterior takes more planning.
Design by M&M remodels kitchens across Los Gatos with dedicated crews and a front-loaded process, so the schedule we give you is one we can actually hold.
CSLB License #1082131 · Licensed, bonded and insured · 22+ years of experience · 1,000+ projects completed
Who This Is For
- Opening a closed-off kitchen to the living or dining space
- Reworking a layout that has never quite functioned
- Remodeling a kitchen as part of a wider renovation or home addition
- Replacing cabinets, counters and appliances as one coordinated, designed project
- Bringing together a kitchen that has been part-updated over the years and no longer hangs together
- Modernizing the kitchen in an older Los Gatos home, including the electrical and plumbing behind the walls
Standalone kitchen or part of a bigger project — both are normal work for us.
What a Kitchen Remodel Includes
A kitchen remodel touches almost every trade in the house, which is why the planning matters as much as the build. A full project in Los Gatos normally includes the following.
Scope of work
- Layout planning and design
- Cabinetry — custom, semi-custom, or supplied
- Countertops and backsplashes
- Appliance planning, fitting, and coordination
- Plumbing relocation and fixture installation
- Electrical, including dedicated circuits and lighting design
- Ventilation and range hood venting
- Flooring
- Structural work where walls are being removed
- Permit applications and inspection coordination
Standalone or part of a larger renovation — both are normal work for us. Many Los Gatos kitchens are remodeled alongside a room addition or a garage conversion, so the whole project is designed and scheduled together.
Permits and Requirements in Los Gatos
Non-structural kitchens can use Express Check. The Town offers an Express Check path for non-structural residential kitchen remodels. Applications start with an online pre-application, and the plan check fee follows once it is accepted.
Exterior changes need Planning approval. Any exterior change, such as new windows, doors or siding, needs Planning Department approval before the building permit.
Moving plumbing brings in the sanitation district. If fixtures are added or moved, a certificate from West Valley Sanitation District is required. Homes in an HOA also need a letter approving the work before the permit is issued.
The Town spells out kitchen electrical requirements. Los Gatos requires two 20-amp dedicated circuits for counter receptacles, GFCI and AFCI protection at counter outlets, high-efficacy lighting and separate circuits for an electric oven and range.
Removing a wall is the main fork in the road. Opening a kitchen to the living or dining area is the most common Los Gatos kitchen project. If the wall carries load, the project needs structural engineering and fuller review. Establishing which walls are structural is one of the first things we check, because it drives the permit path, the schedule and a significant share of the budget.
Title 24 energy requirements apply to lighting and certain equipment in a kitchen remodel. We design to them rather than retrofitting after an inspection.
We confirm current requirements with the Town of Los Gatos Building Division for every project.
How We Run a Kitchen Project
- Consultation — how you use the kitchen, what is not working, and a realistic budget range
- Design — layout, cabinetry, appliances, and finishes
- Selections locked before demolition — this is the step that protects the schedule
- Permit — Express Check for non-structural kitchens, full plan review when walls or the exterior change
- Ordering — cabinetry and appliance lead times drive the start date, not the other way around
- Demolition and rough-in — plumbing, electrical, structural
- Inspections — coordinated by us
- Installation and finishes — cabinetry, counters, appliances, tile, trim
- Walkthrough — punch list and closeout
We do not start demolition until cabinetry is ordered and a delivery date is confirmed. Tearing out a kitchen and then waiting ten weeks for cabinets is the single most common way these projects go wrong, and it is entirely avoidable.
What Affects the Cost
- Cabinetry — the largest single line on most kitchen budgets, and the widest range
- Whether the layout stays or plumbing and gas move
- Whether a wall is coming out, and whether it is load-bearing
- Countertop material and quantity
- Appliance selections
- Electrical capacity and whether the panel needs upgrading
- Ventilation, especially where new ducting is required
- Flooring
- Condition of what is behind the existing cabinets
Cabinetry and layout changes are where the budget is decided. Everything else moves the number far less than people expect.
Design in 3 simple steps
Consult & Design
We start with a thorough consultation, creating custom designs tailored to your style and needs.
Expert Construction
Our skilled team manages every detail, from demolition to installation, ensuring precision and quality.
Enjoyment
We complete your project with meticulous attention, ensuring your complete satisfaction and a stunning new kitchen.
Area We Serve: San Francisco | San Mateo | Redwood City | Palo Alto | Menlo Park | Atherton | Mountain View | Sunnyvale | Los Altos | Cupertino | Saratoga | Los Gatos | San Jose
Frequently Asked Questions
If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help!
Yes. Design by M&M holds California contractor license #1082131 and is licensed, bonded and insured. You can check the status of any California contractor's license yourself at cslb.ca.gov — we would encourage it, for us or anyone else you are considering.
More than 22 years of building in the Bay Area, across more than 1,000 completed projects. That covers additions, ADUs, custom homes, and full renovations, which is why we can usually tell you early whether what you have in mind is realistic for your property.
That is the question worth planning around, and it depends more on ordering than on construction. We sequence so that demolition happens once materials are secured, which keeps the kitchen-less period as short as the project allows. We give you a realistic figure after design, not an optimistic one at the first meeting.
Yes. Non-structural kitchen remodels can use the Town's Express Check path. Exterior changes need Planning approval, and moving plumbing fixtures needs a West Valley Sanitation District certificate.
Often, yes — but whether it is load-bearing determines the cost and the permit path. That is one of the first things we establish, because the answer changes the project substantially.
Sometimes not. Older Los Gatos homes frequently need panel or circuit work to support modern appliances. We check capacity during the consultation so it is in the budget from the start.
Yes. We will flag anything that will not work with the layout or the requirements before it is ordered, which is cheaper than finding out on delivery day.
Yes, both.
Almost always. We set up containment and talk through temporary kitchen arrangements during planning — a sink, a fridge and a microwave somewhere workable makes a large difference.