Kitchen Remodeling in San Mateo, CA

The hardest part of a kitchen remodel is not the construction. It is being without a kitchen. Every week the schedule slips is another week of eating out, and the projects that run long are almost always the ones where a decision was still pending when the crew was ready for it.

Design by M&M remodels kitchens across San Mateo with dedicated crews and a front-loaded process, so the schedule we give you is one we can actually hold.

CSLB License #1082131 · Licensed, bonded and insured · 22+ years of experience · 1,000+ projects completed

Who This Is For

  • Opening a closed-off kitchen to the living or dining space
  • Reworking a layout that has never quite functioned
  • Remodeling a kitchen as part of a wider renovation or home addition
  • Replacing cabinets, counters and appliances as one coordinated, designed project
  • Bringing together a kitchen that has been part-updated over the years and no longer hangs together
  • Modernizing the kitchen in an older San Mateo home, including the electrical and plumbing behind the walls

Standalone kitchen or part of a bigger project — both are normal work for us.

YOUR DREAM KITCHEN

What a Kitchen Remodel Includes

A kitchen remodel touches almost every trade in the house, which is why the planning matters as much as the build. A full project in San Mateo normally includes the following.

Scope of work

Standalone or part of a larger renovation — both are normal work for us. Many San Mateo kitchens are remodeled alongside a room addition or a garage conversion, so the whole project is designed and scheduled together.

The heart of your home

Permits and Requirements in San Mateo

Many kitchen remodels qualify for over-the-counter review. The City of San Mateo lists kitchen remodels, including wall changes built with conventional framing, among the projects its plan checkers can review over the counter, in person or virtually, as long as no structural calculations or fire review are needed. For a kitchen that keeps its footprint, that can remove most of the plan review wait.

Removing a wall changes the picture. Opening a kitchen to an adjoining room is the most common San Mateo kitchen project and the one most likely to need more than a counter permit. If the wall is load-bearing, the project needs structural engineering and proper plan review. Establishing which walls are structural is the first thing we check, because it determines both the permit path and a significant part of the budget.

Electrical requirements often drive more work than expected. Modern kitchens need dedicated circuits for appliances, GFCI protection at counter-level outlets, and adequate service capacity. Older San Mateo homes frequently need panel work to support a new kitchen — worth knowing early rather than mid-project.

Plans are required for permitted work. Expect to submit existing and proposed floor plans showing electrical, plumbing and mechanical, with a written scope of work. We prepare them.

Title 24 energy requirements apply to lighting and certain equipment in a kitchen remodel. We design to them rather than retrofitting after an inspection.

We confirm current requirements with the Building Division for every project.

How We Run a Kitchen Project

  1. Consultation — how you use the kitchen, what is not working, and a realistic budget range
  2. Design — layout, cabinetry, appliances, and finishes
  3. Selections locked before demolition — this is the step that protects the schedule
  4. Permit — over the counter where the project qualifies, plan review where it does not
  5. Ordering — cabinetry and appliance lead times drive the start date, not the other way around
  6. Demolition and rough-in — plumbing, electrical, structural
  7. Inspections — coordinated by us
  8. Installation and finishes — cabinetry, counters, appliances, tile, trim
  9. Walkthrough — punch list and closeout

We do not start demolition until cabinetry is ordered and a delivery date is confirmed. Tearing out a kitchen and then waiting ten weeks for cabinets is the single most common way these projects go wrong, and it is entirely avoidable.

What Affects the Cost

  • Cabinetry — the largest single line on most kitchen budgets, and the widest range
  • Whether the layout stays or plumbing and gas move
  • Whether a wall is coming out, and whether it is load-bearing
  • Countertop material and quantity
  • Appliance selections
  • Electrical capacity and whether the panel needs upgrading
  • Ventilation, especially where new ducting is required
  • Flooring
  • Condition of what is behind the existing cabinets

Cabinetry and layout changes are where the budget is decided. Everything else moves the number far less than people expect.

Design in 3 simple steps

01

Consult & Design

We start with a thorough consultation, creating custom designs tailored to your style and needs.

02

Expert Construction

Our skilled team manages every detail, from demolition to installation, ensuring precision and quality.

03

Enjoyment

We complete your project with meticulous attention, ensuring your complete satisfaction and a stunning new kitchen.

/ FAQ

Frequently Asked Questions

If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help!

Yes. Design by M&M holds California contractor license #1082131 and is licensed, bonded and insured. You can check the status of any California contractor's license yourself at cslb.ca.gov — we would encourage it, for us or anyone else you are considering.

Sometimes not. Older San Mateo homes frequently need panel or circuit work to support modern appliances. We check capacity during the consultation so it is in the budget from the start.

Start Your San Mateo Kitchen Remodel

Scroll to Top