In Cupertino, the permit is usually the longest wait in a kitchen remodel, not the construction. The city’s current plan review averages run several weeks for a first review, so a kitchen that is fully designed before it is submitted saves real time.

Design by M&M remodels kitchens across Cupertino with dedicated crews and a front-loaded process, so the schedule we give you is one we can actually hold.

CSLB License #1082131 · Licensed, bonded and insured · 22+ years of experience · 1,000+ projects completed

Who This Is For

  • Opening a closed-off kitchen to the living or dining space
  • Reworking a layout that has never quite functioned
  • Remodeling a kitchen as part of a wider renovation or home addition
  • Replacing cabinets, counters and appliances as one coordinated, designed project
  • Bringing together a kitchen that has been part-updated over the years and no longer hangs together
  • Modernizing the kitchen in an older Cupertino home, including the electrical and plumbing behind the walls

Standalone kitchen or part of a bigger project — both are normal work for us.

YOUR DREAM KITCHEN

What a Kitchen Remodel Includes

A kitchen remodel touches almost every trade in the house, which is why the planning matters as much as the build. A full project in Cupertino normally includes the following.

Scope of work

Standalone or part of a larger renovation — both are normal work for us. Many Cupertino kitchens are remodeled alongside a room addition or a garage conversion, so the whole project is designed and scheduled together.

The heart of your home

Permits and Requirements in Cupertino

A permit is required for most kitchen remodels. Cupertino requires a building permit for kitchen remodels. Replacing cabinets or countertops alone is exempt only when no electrical, plumbing or mechanical systems or walls are altered.

Plan review takes weeks, so we submit complete plans. The city lists current average plan review times of 20 to 30 business days for the first review and 10 to 20 business days for each later review. Complete, signed plans reduce the number of rounds.

Plans need more detail than many homeowners expect. Cupertino asks for dimensioned existing and proposed floor plans, a ceiling plan, electrical, plumbing and mechanical layouts, energy forms and, where walls move, a structural framing plan. We prepare them.

Venting the range hood has its own rules. A mechanical permit is needed to replace a hood that vents outside. The vent must end at least 3 feet from other openings, and flexible corrugated duct is not allowed.

Removing a wall is the main fork in the road. Opening a kitchen to the living or dining area is the most common Cupertino kitchen project. If the wall carries load, the project needs structural engineering and fuller review. Establishing which walls are structural is one of the first things we check, because it drives the permit path, the schedule and a significant share of the budget.

Electrical capacity is a common constraint. Modern kitchens need dedicated appliance circuits and GFCI protection at counter-level outlets. Cupertino requires two 20-amp small-appliance circuits, dedicated circuits for appliances such as the dishwasher and disposal, and AFCI protection. Older Cupertino homes often need panel or circuit work to support that, which is worth knowing early rather than mid-project.

Title 24 energy requirements apply to lighting and certain equipment in a kitchen remodel. We design to them rather than retrofitting after an inspection.

We confirm current requirements with the Cupertino Building Division for every project.

How We Run a Kitchen Project

  1. Consultation — how you use the kitchen, what is not working, and a realistic budget range
  2. Design — layout, cabinetry, appliances, and finishes
  3. Selections locked before demolition — this is the step that protects the schedule
  4. Permit — plan review with the Building Division, with the review time built into your schedule
  5. Ordering — cabinetry and appliance lead times drive the start date, not the other way around
  6. Demolition and rough-in — plumbing, electrical, structural
  7. Inspections — coordinated by us
  8. Installation and finishes — cabinetry, counters, appliances, tile, trim
  9. Walkthrough — punch list and closeout

We do not start demolition until cabinetry is ordered and a delivery date is confirmed. Tearing out a kitchen and then waiting ten weeks for cabinets is the single most common way these projects go wrong, and it is entirely avoidable.

What Affects the Cost

  • Cabinetry — the largest single line on most kitchen budgets, and the widest range
  • Whether the layout stays or plumbing and gas move
  • Whether a wall is coming out, and whether it is load-bearing
  • Countertop material and quantity
  • Appliance selections
  • Electrical capacity and whether the panel needs upgrading
  • Ventilation, especially where new ducting is required
  • Flooring
  • Condition of what is behind the existing cabinets

Cabinetry and layout changes are where the budget is decided. Everything else moves the number far less than people expect.

Design in 3 simple steps

01

Consult & Design

We start with a thorough consultation, creating custom designs tailored to your style and needs.

02

Expert Construction

Our skilled team manages every detail, from demolition to installation, ensuring precision and quality.

03

Enjoyment

We complete your project with meticulous attention, ensuring your complete satisfaction and a stunning new kitchen.

/ FAQ

Frequently Asked Questions

If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help!

Yes. Design by M&M holds California contractor license #1082131 and is licensed, bonded and insured. You can check the status of any California contractor's license yourself at cslb.ca.gov — we would encourage it, for us or anyone else you are considering.

Sometimes not. Older Cupertino homes frequently need panel or circuit work to support modern appliances. We check capacity during the consultation so it is in the budget from the start.