Redwood City reviews ADUs ministerially, with no hearing, and allows new detached ADUs of up to 1,200 square feet of living space with four-foot side and rear setbacks. Design by M&M designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across Redwood City, with 22+ years of experience, 1,000+ completed projects and CSLB license #1082131.
Redwood City lots range from compact parcels near downtown to larger, sloping lots in Farm Hills and the hills west of Alameda de las Pulgas. The right ADU depends on yard size, slope, utility locations and how you plan to use the space.
A standalone backyard home of up to 1,200 square feet of interior living space, with its own kitchen, bathroom and entrance. It gives the most privacy for a tenant or family member.
An addition to the main house, limited to 50 percent of the home’s size, with at least 800 square feet always allowed. It shares a wall with the home, which can shorten utility runs.
Converting an existing garage has no size limit and needs no new setbacks or replacement parking. See our guide to garage conversions in Redwood City.
Up to 500 square feet inside the existing home, with an efficiency kitchen and its own outside entrance. A junior ADU deed restriction must be notarized and recorded.
Need more room for your own household rather than a separate unit? A room addition in Redwood City may be the better fit, and the two can often be planned together.
State ADU law sets the baseline, and Redwood City applies its own standards on top. These are the rules that shape most projects:
Rules change and every lot is different, so we confirm current requirements with Redwood City before design is finalized. For background on unit types, see our guides to detached ADUs and junior ADUs.
Plan for three phases. Design and engineering come first, along with the fire flow test and sewer permit. City plan review follows, and state law requires a decision within 60 days of a complete application. Construction length depends on the ADU type: a garage conversion is usually the fastest, and a new detached unit takes the longest. We give you a schedule for all three phases at the start. Design by M&M handles design, engineering, permits and construction under one contract, so you work with one team from the first site visit to the final inspection.
Learn more about our ADU construction services across the Bay Area.
We visit the property, check the lot, utilities, panel and sewer, and confirm what your city allows: detached ADU, attached ADU, garage conversion or junior ADU.
Floor plans, 3D design previews and a detailed estimate, then structural and Title 24 drawings, submittal and plan check through permit issuance.
Our team builds the foundation, framing, utilities, insulation and finishes, then closes out the permit with the city and walks you through the finished ADU.
If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help.
Yes. ADUs are allowed in all residential and mixed-use zones on lots with a single-family or multifamily home, and they are approved ministerially with no hearing.
Up to 1,200 square feet of interior living space. Attached ADUs are limited to 50 percent of the main house, with 800 square feet always allowed. Junior ADUs are limited to 500 square feet.
Sixteen feet in most locations, or 18 feet within half a mile of transit, with up to 2 more feet to match the roof pitch of the main house.
Often not. Parking is not required for conversions, ADUs within half a mile of transit, or junior ADUs, and a converted garage does not need replacement parking. Otherwise the limit is one space per ADU.
The city determines completeness within 15 business days and decides within 60 days of a complete application. The fire flow test for a detached ADU typically takes about four weeks, so we start it early.
The city lists base fees of $3,469 for up to 400 square feet or a garage conversion, $4,042 for 401 to 600 square feet and $4,615 for 601 to 800 square feet. School district and utility fees can apply on top.
Not for an ADU. For a junior ADU, the owner must live on the property if the unit shares sanitation with the main house.
Yes, for terms longer than 30 days. Short-term rentals are not allowed.
A single-family lot can have a converted ADU, a new detached ADU of up to 800 square feet and a junior ADU.
No. Sprinklers are required only if the main house already needs them, and an ADU or junior ADU cannot trigger them in the main home.