Saratoga allows detached ADUs of up to 1,200 square feet of living area and approves compliant ADUs ministerially within 60 days of a complete application. Design by M&M designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across Saratoga, with 22+ years of experience, 1,000+ completed projects and CSLB license #1082131.
Saratoga lots are often large, with deep yards, mature trees and hillside terrain in many neighborhoods. That gives homeowners room for a generous ADU, but slope, trees and access shape where it can go.
A standalone home of up to 1,200 square feet of living area, not counting a garage. An ADU of up to 800 square feet is always allowed with four-foot side and rear setbacks.
An addition to the main house of up to 50 percent of its living area, capped at 1,200 square feet. It follows the main house setbacks and can reach 25 feet or two stories, or the house limit if lower.
Converting an existing garage reuses the walls, roof and slab, and Saratoga does not require the lost parking to be replaced. See our guide to garage conversions in Saratoga.
Up to 500 square feet inside the existing home, with an efficiency kitchen and its own entrance. Saratoga allows up to two junior ADUs on a single-family lot.
Need more room for your own household rather than a separate unit? A room addition in Saratoga may be the better fit, and the two can often be planned together.
State ADU law sets the baseline, and the City of Saratoga applies its own standards on top. These are the rules that shape most projects:
Rules change and every lot is different, so we confirm current requirements with the City of Saratoga before design is finalized. For background on unit types, see our guides to detached ADUs and junior ADUs.
Plan for three phases. Design and engineering come first, plus any geotechnical work on a hillside lot. City review follows, and the city must decide within 60 days of a complete application. Construction length depends on the ADU type: a garage conversion is usually the fastest, and a new detached unit takes the longest. We give you a schedule for all three phases at the start. Design by M&M handles design, engineering, permits and construction under one contract, so you work with one team from the first site visit to the final inspection.
Learn more about our ADU construction services across the Bay Area.
We visit the property, check the lot, utilities, panel and sewer, and confirm what your city allows: detached ADU, attached ADU, garage conversion or junior ADU.
Floor plans, 3D design previews and a detailed estimate, then structural and Title 24 drawings, submittal and plan check through permit issuance.
Our team builds the foundation, framing, utilities, insulation and finishes, then closes out the permit with the city and walks you through the finished ADU.
If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help.
Yes. Saratoga allows ADUs on lots with a single-family or multifamily home and approves compliant ADUs ministerially, without a public hearing.
Up to 1,200 square feet of living area, not including a garage. An ADU of up to 800 square feet is always allowed with four-foot side and rear setbacks.
Sixteen feet in most locations, or 18 feet within half a mile walking distance of a major transit stop, with up to 2 more feet to match the main roof pitch.
A single-family lot can have one ADU and up to two junior ADUs within existing space, plus one new detached ADU.
The city must approve or deny a compliant application within 60 days of receiving it complete. Design and any correction rounds come on top of that.
One space is required in most cases, but there are exemptions near transit, in historic districts, for conversions and for junior ADUs. A converted garage does not need replacement parking.
Not for an ADU. A junior ADU requires the owner to live in the main house or the junior ADU, with a recorded deed restriction.
Yes, for terms longer than 30 days. Short-term rentals are not allowed, and the ADU cannot be sold separately from the main house.
A new ADU must match the main house in color, and roof decks are not allowed on new ADUs.
Often, yes. Hillside lots can need a topographic survey, a geologic report and a foundation designed for slope, which we plan for during feasibility.