ADU Builder in San Mateo, CA

San Mateo approves code-compliant ADUs with a building permit alone, with no planning application or public notice, and an ADU of up to 800 square feet does not count against your lot’s floor area. Design by M&M designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across San Mateo, with 22+ years of experience, 1,000+ completed projects and CSLB license #1082131.

Lifetime Warranty

license , bonded and insured

3d dESIGN pREVIEWS

100+ Reviews · 4.9 on Google

lUXURY fINISHES

ADU Options in San Mateo

San Mateo has everything from 1920s Baywood bungalows to postwar ranch homes in the Hillsdale and Sugarloaf areas, and lot shapes vary widely. The right ADU depends on how much yard you have, where your utilities run and how you plan to use the space.

Detached ADU

A standalone backyard home with its own kitchen, bathroom and entrance. It gives the most privacy for a tenant or family member. San Mateo sets no fixed size cap; units over 800 square feet are limited by the lot’s floor area ratio and must be smaller than the main house.

Attached ADU

An addition to the main house with its own entrance and full kitchen. It shares a wall with the home, which can shorten utility runs and keep more of the yard open.

Garage conversion ADU

Converting an existing garage reuses the walls, roof and slab. San Mateo waives the parking requirement when the ADU sits inside an existing legal structure. See our guide to garage conversions in San Mateo.

Junior ADU

Up to 500 square feet inside the existing home or an attached garage, with an efficiency kitchen and its own outside entrance. A junior ADU cannot go in a detached building.

Need more room for your own household rather than a separate unit? A room addition in San Mateo may be the better fit, and the two can often be planned together.

ADU CONSTRUCTION

San Mateo ADU Rules That Shape Your Project

State ADU law sets the baseline, and the City of San Mateo applies its own standards on top. These are the rules that shape most projects:

  • Size: no maximum for an ADU, but anything over 800 square feet counts toward the lot’s floor area ratio and the ADU must be smaller than the main house. Junior ADUs are capped at 500 square feet.
  • Height: detached ADUs can reach 16 feet to the top plate and 24 feet to the roof peak. Attached ADUs can reach 24 feet to the plate and 32 feet to the peak.
  • Setbacks and daylight plane: four feet from side and rear property lines. Every ADU must also fit within a daylight plane that starts 12 feet up at the side and rear lines and angles inward at 45 degrees. Neighboring cities set their own standards; see ADU rules across San Mateo County.
  • Parking: one off-street space for a new ADU, which can be uncovered or tandem. It is waived within half a mile walking distance of public transit, for ADUs inside an existing legal structure, and in a few other cases. Junior ADUs need no parking.
  • Solar: new detached ADUs need solar panels, on either the ADU or the main house.
  • Rentals: ADUs and junior ADUs cannot be rented for less than 30 days or sold separately from the main house. A junior ADU requires the owner to live on the property if one of the units is rented.
  • Fees: permit fees follow the city fee schedule, school district impact fees may apply, and a detached ADU may carry utility connection charges.

Rules change and every lot is different, so we confirm current requirements with the City of San Mateo before design is finalized. For background on unit types, see our guides to detached ADUs and junior ADUs.

The San Mateo ADU Permit Process

  1. Feasibility and design. We review the lot, utilities, floor area and daylight plane, then design the ADU to San Mateo’s objective standards.
  2. Building permit submittal. A compliant ADU goes straight to a building permit, with no planning application or public notice. The city assigns the new unit its own address before the permit is issued.
  3. Plan review. If the city issues comments, we revise and resubmit. State law requires a decision within 60 days of a complete application.
  4. Construction and inspections. The city inspects foundation, framing, rough utilities, insulation and final work.

If a design needs to exceed a standard, such as the detached height limit, it moves to discretionary review by the Zoning Administrator with public notice. We design to avoid that wherever the client’s goals allow.

What Makes a San Mateo Lot Easier or Harder to Build On

  • Flat rear yards with alley or side access make detached ADUs simpler to build and service.
  • Lots already close to their floor area limit may need to keep the ADU at 800 square feet or less.
  • The daylight plane can limit second-story ADUs on narrow lots, so we model it early.
  • Parcels in the hillside areas west of El Camino Real or in flood zones near the bay can need extra engineering.
  • Older homes often need an electrical panel upgrade or a new sewer lateral to support a second unit.

How Long Does an ADU Take in San Mateo?

Plan for three phases. Design and engineering come first. City plan review follows, and its length depends on how complete the first submission is. Construction length depends on the ADU type: a garage conversion is usually the fastest, and a new detached unit takes the longest. We give you a schedule for all three phases at the start. Design by M&M handles design, engineering, permits and construction under one contract, so you work with one team from the first site visit to the final inspection.

Learn more about our ADU construction services across the Bay Area.

Our Design-Build Process

01

Consult & Feasibility

We visit the property, check the lot, utilities, panel and sewer, and confirm what your city allows: detached ADU, attached ADU, garage conversion or junior ADU.

02

Design & Permits

Floor plans, 3D design previews and a detailed estimate, then structural and Title 24 drawings, submittal and plan check through permit issuance.

03

Build & Final Inspection

Our team builds the foundation, framing, utilities, insulation and finishes, then closes out the permit with the city and walks you through the finished ADU.

Area We Serve: San Francisco | Palo Alto | Menlo Park | Atherton | Mountain View | Sunnyvale | Los Altos Hills | Belmont | Redwood City | San Mateo | Pacifica | Hillsborough | San Carlos | Woodside | Portola Valley | Saratoga | Los Gatos | Cupertino | San Jose |Santa Clara | Daly City | San Bruno | Millbrae | Burlingame | Los Altos | Campbell | Milpitas | Brisbane | Foster City

/ FAQ

Frequently Asked Questions

If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help.

Yes. San Mateo allows ADUs on residential lots with an existing or proposed home. A compliant ADU needs only a building permit, with no planning application or public notice.

Not for an ADU. For a junior ADU, the owner must live on the property if one of the units is rented.

Scroll to Top