Cupertino allows detached ADUs of up to 850 square feet with one bedroom or 1,000 square feet with two or more, and an ADU of 800 square feet or less does not count against your floor area or lot coverage (see Cupertino ADU rules explained). Design by M&M designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across Cupertino, with 22+ years of experience, 1,000+ completed projects and CSLB license #1082131.
Most Cupertino neighborhoods are single-family lots with one- and two-story homes, many already built close to their floor area limit. That makes the size and type of ADU an important early decision, because it decides which other units you can add later.
A standalone backyard home with its own kitchen, bathroom and entrance. Up to 800 square feet is exempt from floor area and lot coverage limits and can sit four feet from the side and rear lines. Larger units can reach 850 or 1,000 square feet, depending on bedrooms, but must fit within the lot’s floor area and coverage.
An addition to the main house with its own entrance and full kitchen. It must fit within the lot’s floor area ratio and lot coverage, and in Cupertino it cannot be paired with a junior ADU.
Converting an existing garage reuses the walls, roof and slab, and Cupertino does not require replacement parking. A converted garage cannot be a junior ADU. See our guide to garage conversions in Cupertino.
Up to 500 square feet carved from living space inside the home, with an efficiency kitchen. It must stay within the lot’s 45 percent floor area ratio, and the owner must live on the property.
Need more room for your own household rather than a separate unit? A room addition in Cupertino may be the better fit, and the two can often be planned together.
State ADU law sets the baseline, and the City of Cupertino applies its own standards on top. These are the rules that shape most projects:
Rules change and every lot is different, so we confirm current requirements with the City of Cupertino before design is finalized. For background on unit types, see our guides to detached ADUs and junior ADUs.
Plan for three phases. Design and engineering come first, along with any early zoning review. City plan review follows, and state law requires a decision within 60 days of a complete application. Construction length depends on the ADU type: a garage conversion is usually the fastest, and a new detached unit takes the longest. We give you a schedule for all three phases at the start. Design by M&M handles design, engineering, permits and construction under one contract, so you work with one team from the first site visit to the final inspection.
Learn more about our ADU construction services across the Bay Area.
We visit the property, check the lot, utilities, panel and sewer, and confirm what your city allows: detached ADU, attached ADU, garage conversion or junior ADU.
Floor plans, 3D design previews and a detailed estimate, then structural and Title 24 drawings, submittal and plan check through permit issuance.
Our team builds the foundation, framing, utilities, insulation and finishes, then closes out the permit with the city and walks you through the finished ADU.
If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help.
Yes. Cupertino allows ADUs on single-family and multifamily lots, and a compliant ADU is approved with a building permit, without a public hearing.
Up to 850 square feet with one bedroom or 1,000 square feet with two or more. Units of 800 square feet or less are exempt from floor area and lot coverage limits.
Up to 18 feet. Attached ADUs can reach 25 feet or the main house limit, whichever is lower.
Up to three on a single-family lot, depending on the mix. A junior ADU cannot be combined with an attached ADU or a detached ADU over 800 square feet.
State law requires the city to decide on a complete application within 60 days. Design and any correction rounds come on top of that, so a complete first submittal matters.
No. Cupertino does not require replacement parking when a garage becomes an ADU. Note that a converted garage cannot be a junior ADU.
ADUs under 750 square feet do not pay park or storm drain impact fees. Larger ADUs do, and school impact fees can apply to any size.
Not for an ADU. A junior ADU requires the owner to live in either the main house or the junior ADU, with a recorded deed restriction.
Yes, but not as a short-term rental, and the ADU cannot be sold separately from the main house.
Yes, as long as the garage or covered patio meets the size, height and setback rules and stays within the lot's floor area and coverage limits.