ADU Builder in Redwood City, CA

Redwood City reviews ADUs ministerially, with no hearing, and allows new detached ADUs of up to 1,200 square feet of living space with four-foot side and rear setbacks. Design by M&M designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across Redwood City, with 22+ years of experience, 1,000+ completed projects and CSLB license #1082131.

Lifetime Warranty

license , bonded and insured

3d dESIGN pREVIEWS

100+ Reviews · 4.9 on Google

lUXURY fINISHES

ADU Options in Redwood City

Redwood City lots range from compact parcels near downtown to larger, sloping lots in Farm Hills and the hills west of Alameda de las Pulgas. The right ADU depends on yard size, slope, utility locations and how you plan to use the space.

Detached ADU

A standalone backyard home of up to 1,200 square feet of interior living space, with its own kitchen, bathroom and entrance. It gives the most privacy for a tenant or family member.

Attached ADU

An addition to the main house, limited to 50 percent of the home’s size, with at least 800 square feet always allowed. It shares a wall with the home, which can shorten utility runs.

Garage conversion ADU

Converting an existing garage has no size limit and needs no new setbacks or replacement parking. See our guide to garage conversions in Redwood City.

Junior ADU

Up to 500 square feet inside the existing home, with an efficiency kitchen and its own outside entrance. A junior ADU deed restriction must be notarized and recorded.

Need more room for your own household rather than a separate unit? A room addition in Redwood City may be the better fit, and the two can often be planned together.

ADU CONSTRUCTION

Redwood City ADU Rules That Shape Your Project

State ADU law sets the baseline, and Redwood City applies its own standards on top. These are the rules that shape most projects:

  • Size: new detached ADUs up to 1,200 square feet of interior living space. Attached ADUs up to 50 percent of the main house, with 800 square feet always allowed. Conversions of existing space have no size limit. Junior ADUs are capped at 500 square feet.
  • Height: detached ADUs are limited to 16 feet, or 18 feet within half a mile of transit with 2 more feet to match the main roof pitch. Attached ADUs can reach 25 feet or the zoning limit for the house, whichever is lower.
  • Setbacks: four feet from side and rear property lines for new construction. A conversion within existing space needs no new setback.
  • Parking: no more than one space per ADU, and none for conversions, ADUs within half a mile of transit, or junior ADUs. Converting a garage does not require replacement parking.
  • Owner occupancy: none for an ADU. For a junior ADU, the owner must live on the property if it shares sanitation with the main house.
  • Fees: base permit fees listed by the city are $3,469 for up to 400 square feet or a garage conversion, $4,042 for 401 to 600 square feet, and $4,615 for 601 to 800 square feet, plus minor administrative fees.
  • Sprinklers: required only if the main house already needs them. An ADU cannot trigger sprinklers in the main home.

Rules change and every lot is different, so we confirm current requirements with Redwood City before design is finalized. For background on unit types, see our guides to detached ADUs and junior ADUs.

The Redwood City ADU Permit Process

  1. Feasibility and design. We review the lot, slope, soils and utilities, then design the ADU to Redwood City’s objective standards. The city recommends meeting a planner early, and we handle that.
  2. Completeness check. We submit the city’s ADU completeness checklist. Redwood City determines completeness within 15 business days.
  3. Building permit and plans. Plans and the permit application go in through the city’s eTrakIt portal. The city decides within 60 days of a complete application.
  4. Utility approvals. New detached ADUs need a fire flow test, which typically takes about four weeks to schedule, and a sewer permit from West Bay Sanitary District is required before construction. We order both early.
  5. Construction and inspections. The city inspects each stage. An ADU homeowner survey is required to finalize the permit.

What Makes a Redwood City Lot Easier or Harder to Build On

  • Flat rear yards with side access make detached ADUs simpler to build and service.
  • Hillside lots in Farm Hills and the western hills need foundation design for slope, and parcels near the bay can need foundations designed for bay mud.
  • Some areas fall under Wildland-Urban Interface rules, which add fire-resistant construction requirements.
  • Lots far from the street water main can need longer utility runs, and the fire flow test confirms whether water supply is adequate.
  • Older homes often need an electrical panel upgrade to support a second unit.

How Long Does an ADU Take in Redwood City?

Plan for three phases. Design and engineering come first, along with the fire flow test and sewer permit. City plan review follows, and state law requires a decision within 60 days of a complete application. Construction length depends on the ADU type: a garage conversion is usually the fastest, and a new detached unit takes the longest. We give you a schedule for all three phases at the start. Design by M&M handles design, engineering, permits and construction under one contract, so you work with one team from the first site visit to the final inspection.

Learn more about our ADU construction services across the Bay Area.

Our Design-Build Process

01

Consult & Feasibility

We visit the property, check the lot, utilities, panel and sewer, and confirm what your city allows: detached ADU, attached ADU, garage conversion or junior ADU.

02

Design & Permits

Floor plans, 3D design previews and a detailed estimate, then structural and Title 24 drawings, submittal and plan check through permit issuance.

03

Build & Final Inspection

Our team builds the foundation, framing, utilities, insulation and finishes, then closes out the permit with the city and walks you through the finished ADU.

Area We Serve: San Francisco | Palo Alto | Menlo Park | Atherton | Mountain View | Sunnyvale | Los Altos Hills | Belmont | Redwood City | San Mateo | Pacifica | Hillsborough | San Carlos | Woodside | Portola Valley | Saratoga | Los Gatos | Cupertino | San Jose |Santa Clara | Daly City | San Bruno | Millbrae | Burlingame | Los Altos | Campbell | Milpitas | Brisbane | Foster City

/ FAQ

Frequently Asked Questions

If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help.

Yes. ADUs are allowed in all residential and mixed-use zones on lots with a single-family or multifamily home, and they are approved ministerially with no hearing.

The city lists base fees of $3,469 for up to 400 square feet or a garage conversion, $4,042 for 401 to 600 square feet and $4,615 for 601 to 800 square feet. School district and utility fees can apply on top.

Scroll to Top