ADU Builder in Cupertino, CA

Cupertino allows detached ADUs of up to 850 square feet with one bedroom or 1,000 square feet with two or more, and an ADU of 800 square feet or less does not count against your floor area or lot coverage (see Cupertino ADU rules explained). Design by M&M designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across Cupertino, with 22+ years of experience, 1,000+ completed projects and CSLB license #1082131.

Lifetime Warranty

license , bonded and insured

3d dESIGN pREVIEWS

100+ Reviews · 4.9 on Google

lUXURY fINISHES

ADU Options in Cupertino

Most Cupertino neighborhoods are single-family lots with one- and two-story homes, many already built close to their floor area limit. That makes the size and type of ADU an important early decision, because it decides which other units you can add later.

Detached ADU

A standalone backyard home with its own kitchen, bathroom and entrance. Up to 800 square feet is exempt from floor area and lot coverage limits and can sit four feet from the side and rear lines. Larger units can reach 850 or 1,000 square feet, depending on bedrooms, but must fit within the lot’s floor area and coverage.

Attached ADU

An addition to the main house with its own entrance and full kitchen. It must fit within the lot’s floor area ratio and lot coverage, and in Cupertino it cannot be paired with a junior ADU.

Garage conversion ADU

Converting an existing garage reuses the walls, roof and slab, and Cupertino does not require replacement parking. A converted garage cannot be a junior ADU. See our guide to garage conversions in Cupertino.

Junior ADU

Up to 500 square feet carved from living space inside the home, with an efficiency kitchen. It must stay within the lot’s 45 percent floor area ratio, and the owner must live on the property.

Need more room for your own household rather than a separate unit? A room addition in Cupertino may be the better fit, and the two can often be planned together.

ADU CONSTRUCTION

Cupertino ADU Rules That Shape Your Project

State ADU law sets the baseline, and the City of Cupertino applies its own standards on top. These are the rules that shape most projects:

  • Number of units: up to three ADUs on a single-family lot, depending on the combination. A junior ADU cannot be paired with an attached ADU or with a detached ADU over 800 square feet.
  • Size: detached ADUs up to 850 square feet with one bedroom or 1,000 square feet with two or more. Units of 800 square feet or less are exempt from floor area, lot coverage and open space limits. Junior ADUs are capped at 500 square feet.
  • Height: detached ADUs up to 18 feet. Attached ADUs up to 25 feet or the main house limit, whichever is lower. Two-story ADUs are generally limited to converting existing second-story space.
  • Setbacks: four feet from side and rear property lines for ADUs of 800 square feet or less, and at least five feet between a detached ADU and the main house, eave to eave. Larger detached units follow the accessory structure rules.
  • Parking: no replacement parking is required when a garage is converted to an ADU.
  • Fees: ADUs under 750 square feet do not pay park or storm drain impact fees. School impact fees can apply to any size.
  • Rentals: ADUs can be rented but not sold separately, and short-term rentals are not allowed. A junior ADU requires a recorded deed restriction and owner occupancy.

Rules change and every lot is different, so we confirm current requirements with the City of Cupertino before design is finalized. For background on unit types, see our guides to detached ADUs and junior ADUs.

The Cupertino ADU Permit Process

  1. Feasibility and design. We review the lot, floor area, lot coverage and utilities, then choose the ADU type and size that leaves you the most options.
  2. Zoning review. Preliminary plans can go to the Planning Division for a zoning check before the full submittal, which helps catch floor area or setback issues early.
  3. Building permit submittal. A compliant ADU needs a building permit and is approved ministerially, without a public hearing.
  4. Plan review. If the city issues comments, we revise and resubmit. State law requires a decision within 60 days of a complete application.
  5. Construction and inspections. The city inspects foundation, framing, rough utilities, insulation and final work. We also check with your water provider and PG&E about separate meters.

What Makes a Cupertino Lot Easier or Harder to Build On

  • Lots with room under the floor area limit give you the full range of ADU sizes.
  • Lots already near their floor area or lot coverage limit usually work best with an ADU of 800 square feet or less.
  • Narrow side yards can make construction access and utility runs to the backyard harder.
  • Hillside parcels in the western foothills can need extra geotechnical and foundation work.
  • Older homes often need an electrical panel upgrade or a new sewer lateral to support a second unit.

How Long Does an ADU Take in Cupertino?

Plan for three phases. Design and engineering come first, along with any early zoning review. City plan review follows, and state law requires a decision within 60 days of a complete application. Construction length depends on the ADU type: a garage conversion is usually the fastest, and a new detached unit takes the longest. We give you a schedule for all three phases at the start. Design by M&M handles design, engineering, permits and construction under one contract, so you work with one team from the first site visit to the final inspection.

Learn more about our ADU construction services across the Bay Area.

Our Design-Build Process

01

Consult & Feasibility

We visit the property, check the lot, utilities, panel and sewer, and confirm what your city allows: detached ADU, attached ADU, garage conversion or junior ADU.

02

Design & Permits

Floor plans, 3D design previews and a detailed estimate, then structural and Title 24 drawings, submittal and plan check through permit issuance.

03

Build & Final Inspection

Our team builds the foundation, framing, utilities, insulation and finishes, then closes out the permit with the city and walks you through the finished ADU.

Area We Serve: San Francisco | Palo Alto | Menlo Park | Atherton | Mountain View | Sunnyvale | Los Altos Hills | Belmont | Redwood City | San Mateo | Pacifica | Hillsborough | San Carlos | Woodside | Portola Valley | Saratoga | Los Gatos | Cupertino | San Jose | Santa Clara | Daly City | San Bruno | Millbrae | Burlingame | Los Altos | Campbell | Milpitas | Brisbane | Foster City

/ FAQ

Frequently Asked Questions

If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help.

Yes. Cupertino allows ADUs on single-family and multifamily lots, and a compliant ADU is approved with a building permit, without a public hearing.

No. Cupertino does not require replacement parking when a garage becomes an ADU. Note that a converted garage cannot be a junior ADU.

Scroll to Top