ADU Builder in Saratoga, CA

Saratoga allows detached ADUs of up to 1,200 square feet of living area and approves compliant ADUs ministerially within 60 days of a complete application. Design by M&M designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across Saratoga, with 22+ years of experience, 1,000+ completed projects and CSLB license #1082131.

Lifetime Warranty

license , bonded and insured

3d dESIGN pREVIEWS

100+ Reviews · 4.9 on Google

lUXURY fINISHES

ADU Options in Saratoga

Saratoga lots are often large, with deep yards, mature trees and hillside terrain in many neighborhoods. That gives homeowners room for a generous ADU, but slope, trees and access shape where it can go.

Detached ADU

A standalone home of up to 1,200 square feet of living area, not counting a garage. An ADU of up to 800 square feet is always allowed with four-foot side and rear setbacks.

Attached ADU

An addition to the main house of up to 50 percent of its living area, capped at 1,200 square feet. It follows the main house setbacks and can reach 25 feet or two stories, or the house limit if lower.

Garage conversion ADU

Converting an existing garage reuses the walls, roof and slab, and Saratoga does not require the lost parking to be replaced. See our guide to garage conversions in Saratoga.

Junior ADU

Up to 500 square feet inside the existing home, with an efficiency kitchen and its own entrance. Saratoga allows up to two junior ADUs on a single-family lot.

Need more room for your own household rather than a separate unit? A room addition in Saratoga may be the better fit, and the two can often be planned together.

ADU CONSTRUCTION

Saratoga ADU Rules That Shape Your Project

State ADU law sets the baseline, and the City of Saratoga applies its own standards on top. These are the rules that shape most projects:

  • Number of units: one ADU and up to two junior ADUs within the home or an existing accessory structure, plus one new detached ADU, on a single-family lot.
  • Size: detached ADUs up to 1,200 square feet of living area. Attached ADUs up to 50 percent of the main house, capped at 1,200 square feet. Junior ADUs are capped at 500 square feet.
  • Height: detached ADUs up to 16 feet, or 18 feet within half a mile walking distance of a major transit stop, plus 2 feet to match the main roof pitch. Attached ADUs up to 25 feet or two stories, or the main house limit if lower.
  • Setbacks: four feet from side and rear property lines for detached ADUs. Attached ADUs follow the main house setbacks.
  • Parking: one space for a new ADU in most cases, with exemptions near transit, in a historic district, for conversions and for junior ADUs. A garage converted or removed for an ADU does not need replacement parking.
  • Design: a new ADU must match the main house in color, and roof decks are not allowed.
  • Rentals: ADUs and junior ADUs cannot be used as short-term rentals of 30 days or less, or sold separately from the main house. A junior ADU requires owner occupancy and a recorded deed restriction.

Rules change and every lot is different, so we confirm current requirements with the City of Saratoga before design is finalized. For background on unit types, see our guides to detached ADUs and junior ADUs.

The Saratoga ADU Permit Process

  1. Feasibility and design. We review the lot, slope, trees, floor area and utilities, then design the ADU to Saratoga’s objective standards.
  2. Geotechnical review, if needed. Hillside lots can need a topographic survey and a geologic or soils report before design is final.
  3. Application and plan review. Saratoga approves a compliant ADU ministerially, without a hearing, and must approve or deny it within 60 days of a complete application. If the city issues comments, we revise and resubmit.
  4. Construction and inspections. The city inspects foundation, framing, rough utilities, insulation and final work.

What Makes a Saratoga Lot Easier or Harder to Build On

  • Flat, open rear yards make detached ADUs simpler to build and service.
  • Hillside lots need foundation design for slope, and some need a geologic report.
  • Mature and protected trees can limit where an ADU and its foundation can go, so we map them before design.
  • Some hillside areas fall under wildland-urban interface fire rules, which add fire-resistant construction requirements.
  • Long driveways and lots far from the street can mean longer utility runs and harder construction access.

How Long Does an ADU Take in Saratoga?

Plan for three phases. Design and engineering come first, plus any geotechnical work on a hillside lot. City review follows, and the city must decide within 60 days of a complete application. Construction length depends on the ADU type: a garage conversion is usually the fastest, and a new detached unit takes the longest. We give you a schedule for all three phases at the start. Design by M&M handles design, engineering, permits and construction under one contract, so you work with one team from the first site visit to the final inspection.

Learn more about our ADU construction services across the Bay Area.

Our Design-Build Process

01

Consult & Feasibility

We visit the property, check the lot, utilities, panel and sewer, and confirm what your city allows: detached ADU, attached ADU, garage conversion or junior ADU.

02

Design & Permits

Floor plans, 3D design previews and a detailed estimate, then structural and Title 24 drawings, submittal and plan check through permit issuance.

03

Build & Final Inspection

Our team builds the foundation, framing, utilities, insulation and finishes, then closes out the permit with the city and walks you through the finished ADU.

Area We Serve: San Francisco | Palo Alto | Menlo Park | Atherton | Mountain View | Sunnyvale | Los Altos Hills | Belmont | Redwood City | San Mateo | Pacifica | Hillsborough | San Carlos | Woodside | Portola Valley | Saratoga | Los Gatos | Cupertino | San Jose | Santa Clara | Daly City | San Bruno | Millbrae | Burlingame | Los Altos | Campbell | Milpitas | Brisbane | Foster City

/ FAQ

Frequently Asked Questions

If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help.

Yes. Saratoga allows ADUs on lots with a single-family or multifamily home and approves compliant ADUs ministerially, without a public hearing.

One space is required in most cases, but there are exemptions near transit, in historic districts, for conversions and for junior ADUs. A converted garage does not need replacement parking.

Scroll to Top