San Mateo Building Permits for Additions and Remodels: What to Expect

In the City of San Mateo, any home addition needs a building permit, and many need Planning review before the building permit can be issued. Small, conventional projects like a kitchen remodel without structural calculations can be reviewed the same day through the city’s Over-the-Counter or Virtual Over-the-Counter service. An addition, especially a second story, goes through full plan review. Depending on its size, it may also need a Single Family Dwelling Design Review (SFDDR) with neighbor notice.

The difference between those paths can be months, not days. This guide explains how San Mateo’s permit process works for larger residential projects, what triggers Planning review, and how to keep a project moving.

Note: this guide covers the City of San Mateo. If your home is in an unincorporated area of San Mateo County, your permits come from the County Planning and Building Department, which has its own process.

Where San Mateo Building Permits Are Filed

The City of San Mateo handles building permits and planning applications through its Customer Self-Service (CSS) Online Permit Center. Through the portal you can:

  • Submit residential building permit applications and plans
  • Submit single-family planning applications
  • Upload resubmittals and revisions
  • Pay fees and receive the issued permit electronically
  • Search permit records by address, permit number or parcel

The Community Development Department is at 330 West 20th Avenue. The Building Division can be reached at (650) 522-7172 and the Planning Division at (650) 522-7212.

Which Projects Qualify for Over-the-Counter Review?

San Mateo offers Over-the-Counter (OTC) review in person and Virtual Over-the-Counter (VOTC) review through the CSS portal. Plan checkers are available for virtual appointments weekday mornings. The city’s list of eligible residential projects (revised November 14, 2025) includes:

  • Kitchen or bathroom remodels with wall changes that follow conventional design methods, when no structural calculations are needed and no Fire review is required
  • Single-story interior remodels up to 500 square feet, with no structural calculations
  • New or relocated windows, skylights and doors using conventional methods
  • Ground-level decks up to 500 square feet on slopes under 15%
  • Voluntary earthquake retrofits under the California Brace + Bolt program’s standard plan set
  • Solar and battery storage systems for single-family homes

Additions aren’t on the list. Neither are projects tied to active planning applications, projects that may affect zoning or the public right-of-way, or anything a plan checker can’t review in about 30 minutes. If you’re adding square footage, plan on full plan review.

What a Full Building Permit Submittal Includes

For an addition or major alteration, the city’s Residential Plan Submittal Checklist and Submittal Guide call for a complete plan set. A typical set includes:

  • Site plan with setbacks, lot coverage and floor area calculations
  • Floor plans, elevations and sections
  • Structural drawings and calculations
  • Title 24 energy compliance documentation
  • CALGreen residential checklist (green building measures)
  • Residential data on the first sheet: address, parcel number (APN), zoning, lot size, and permitted vs. proposed floor area ratio

Plans are submitted as PDFs through the CSS portal and must meet the city’s eReview format requirements. Incomplete or improperly formatted submittals slow the process before review even starts.

When You Also Need Planning Review

This is where San Mateo differs most from cities with simpler processes. Under the city’s zoning code, a Single Family Dwelling Design Review (SFDDR) is required for:

  • A new two-story home
  • A replacement home, when an existing house is substantially removed
  • Any second-story floor area added to an existing one-story home
  • Second-story additions to an existing two-story home above the city’s size thresholds

For small second-story additions to homes that are already two stories, the city publishes a separate process:

Second-story addition to an existing two-story home Process
Under 50 sq ft Building permit only
50–200 sq ft (or 20% of existing floor area, if less) Building permit + Planning check + neighbor notice + 10-day appeal period
Over that threshold SFDDR planning application

Single-family planning applications are decided by the Zoning Administrator, and the level of neighbor notice depends on the project’s tier. New two-story homes require the applicant to mail notice and hold a neighborhood meeting before submitting, with a 500-foot notice radius. Decisions can be appealed within 10 calendar days.

Projects reviewed under SFDDR are measured against the city’s Single-Family Dwelling Design Guidelines. These address building envelope, neighborhood scale, second-story additions, roof design, wall articulation and privacy. Designing to the guidelines from the start is the best way to avoid redesign. We cover this in detail in our guide to adding a second story in San Mateo.

Planning Review Timing

The city’s Planning Application Guide sets these expectations for planning applications:

  • Staff issue a completeness letter within 30 calendar days of submittal
  • Each resubmittal round may take up to 30 days
  • Applicants have 120 days to respond to comments, or the application may be closed for inactivity
  • After a decision, there’s a 10-day appeal period

Planning approval comes first, then building plan check. For a second-story addition, that sequence is the main reason the permit phase takes longer than many homeowners expect.

Other Reviews That Can Apply

  • Historic review. Projects that substantially demolish a structure 50 or more years old may need a historic evaluation by the city’s consultant.
  • Fire review. Required for some projects, and it can affect sprinkler requirements.
  • Public Works. This can apply to work near the right-of-way, drainage and utility connections.
  • Code enforcement holds. Properties with open code cases, stop-work notices or several recently opened permits are routed to full review.

How Much Does a Building Permit Cost in San Mateo?

Fees depend on the project’s scope and valuation and are set in the city’s adopted fee schedule. A single-family planning application decided by the Zoning Administrator is a separate charge, listed at $4,000 on the city’s current Planning Application Forms. Appeals to the Planning Commission or City Council are $550 each, per the Planning Application Guide. School impact fees and utility connection fees may also apply. Ask your design-build team for a full fee estimate early, so it’s part of the project budget from day one.

How to Keep a San Mateo Permit Moving

  • Confirm Planning triggers before design. Knowing whether you need an SFDDR changes the whole schedule.
  • Design to the Single-Family Design Guidelines. It’s faster than redesigning after comments.
  • Submit a complete, coordinated plan set. Architectural, structural and energy documents should agree with each other.
  • Respond to comments quickly and completely. Every partial response adds another round.
  • Talk to the neighbors early on second-story projects, before formal notice goes out.

Frequently Asked Questions

How do I get a building permit in San Mateo, CA?

Create an account on the city’s Customer Self-Service (CSS) portal, then submit your application and PDF plans there. Minor projects can be reviewed same-day through Over-the-Counter or Virtual Over-the-Counter appointments. Additions and larger remodels go through full plan review, and they may need a Planning application first.

Does a kitchen remodel need a permit in San Mateo?

Yes. A kitchen remodel with wall changes needs a building permit. If it uses conventional framing with no structural calculations and doesn’t need Fire review, it can usually be reviewed same-day through Over-the-Counter or Virtual Over-the-Counter. Remodels that remove bearing walls or need engineering go through full plan review.

Do I need Planning approval for a second-story addition in San Mateo?

Usually, yes. Any second-story floor area added to a one-story home requires a Single Family Dwelling Design Review. Small additions to homes that are already two stories follow a lighter process based on size, as shown in the table above.

How can I look up an existing building permit in San Mateo?

The city’s CSS portal lets you search permit records by address, date range, permit number or parcel number. It also has a map search.

Is the City of San Mateo the same as San Mateo County for permits?

No. Homes inside City of San Mateo limits get permits from the city. Homes in unincorporated areas get permits from the County of San Mateo Planning and Building Department. Neighboring cities such as Burlingame, Belmont and Foster City each run their own departments.

Planning an Addition or Major Remodel in San Mateo?

A San Mateo permit goes smoothly when the design, Planning strategy and construction drawings are developed together. Design by M&M is a Bay Area design-build contractor that handles planning, design, permits and construction under one roof.

Explore our room additions in San Mateo, ADU construction in San Mateo and kitchen remodeling in San Mateo. When you’re ready, tell us about your project.


Sources: City of San Mateo Community Development Department: Online Permit Center; Projects Eligible for OTC and VOTC Review (rev. 11/14/2025); Residential Plan Submittal Checklist and Submittal Guide; The Planning Application Guide; Small Second Story Additions handout (rev. 3/24/2025); Planning Application Forms; Municipal Code §27.08.032. Confirm current requirements with the city before applying.

Start Your Project with Us

Ready to build, remodel, or expand? Fill out the form and our team will be in touch to discuss next steps.

Straightforward, professional, and on your terms.

State License

License number #1082131

Scroll to Top