ADU Builder in Los Gatos, CA

Los Gatos allows ADUs of up to 1,200 square feet with no limit on bedrooms, and an ADU of up to 800 square feet is exempt from the Town’s floor area limits. Design by M&M designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across Los Gatos, with 22+ years of experience, 1,000+ completed projects and CSLB license #1082131.

Lifetime Warranty

license , bonded and insured

3d dESIGN pREVIEWS

100+ Reviews · 4.9 on Google

lUXURY fINISHES

ADU Options in Los Gatos

Los Gatos ranges from historic homes near downtown to large hillside lots in the HR and RC zones. The right ADU depends on your zone, slope, trees and how you plan to use the space.

Detached ADU

A standalone backyard home of up to 1,200 square feet, with its own kitchen, bathroom and entrance. It must sit behind the main house, at least five feet from other buildings.

Attached ADU

An addition to the main house with its own entrance and full kitchen, up to 25 feet tall or the zone’s height limit.

Garage conversion ADU

Converting an existing garage reuses the walls, roof and slab, and the lost parking does not have to be replaced. See our guide to garage conversions in Los Gatos.

Junior ADU

Up to 500 square feet inside the existing home, with an efficiency kitchen and its own entrance. A junior ADU counts toward the home’s allowed floor area and needs no parking.

Need more room for your own household rather than a separate unit? A room addition in Los Gatos may be the better fit, and the two can often be planned together.

ADU CONSTRUCTION

Los Gatos ADU Rules That Shape Your Project

State ADU law sets the baseline, and the Town of Los Gatos applies its own standards on top. These are the rules that shape most projects:

  • Size: up to 1,200 square feet for an ADU, with no limit on bedrooms. Up to 800 square feet is exempt from floor area limits, and larger ADUs get a floor area increase based on lot size. Junior ADUs are capped at 500 square feet.
  • Height: detached ADUs up to 16 feet, or 18 feet near major transit plus 2 feet to match the roof pitch. Attached ADUs up to 25 feet or the zone limit.
  • Setbacks and location: four feet from side and rear property lines. Detached ADUs cannot go in front of the main house and need five feet of separation from other structures.
  • Lot coverage: ADUs and junior ADUs are exempt from the zone’s lot coverage limits.
  • Parking: one space per ADU or per bedroom, whichever is less, with exemptions near transit, in historic districts, for conversions and in other cases. Junior ADUs need no parking.
  • Hillside lots: in the HR and RC zones, lots with 12,000 square feet or more of slope-adjusted area get an extra 1,200 square feet of floor area for the ADU.
  • Fire sprinklers: required in the ADU if the main house has them, and possibly for new construction depending on access and water supply. An ADU does not trigger sprinklers in the existing house.

Rules change and every lot is different, so we confirm current requirements with the Town of Los Gatos and Santa Clara County Fire before design is finalized. For background on unit types, see our guides to detached ADUs and junior ADUs.

The Los Gatos ADU Permit Process

  1. Feasibility and design. We review the zone, slope, trees, floor area and utilities, then design the ADU to the Town’s objective standards.
  2. Fire department input. We confirm sprinkler, access and water supply requirements with Santa Clara County Fire early, especially on hillside lots.
  3. Application and plan review. A compliant ADU is approved ministerially, with no public hearing or notice. If the Town issues comments, we revise and resubmit. State law requires a decision within 60 days of a complete application.
  4. Construction and inspections. The Town inspects foundation, framing, rough utilities, insulation and final work.

What Makes a Los Gatos Lot Easier or Harder to Build On

  • Flat rear yards with side access make detached ADUs simpler to build and service.
  • Hillside lots in the HR and RC zones need foundation design for slope and follow the Hillside Development Standards.
  • Homes that are historic resources limit where an ADU can go, since none may be placed in front of them.
  • Long driveways and limited hydrant access can trigger fire sprinkler or water supply requirements.
  • Older homes often need an electrical panel upgrade or a new sewer lateral to support a second unit.

How Long Does an ADU Take in Los Gatos?

Plan for three phases. Design and engineering come first, along with fire department coordination. Town review follows, and state law requires a decision within 60 days of a complete application. Construction length depends on the ADU type: a garage conversion is usually the fastest, and a new detached unit takes the longest. We give you a schedule for all three phases at the start. Design by M&M handles design, engineering, permits and construction under one contract, so you work with one team from the first site visit to the final inspection.

Learn more about our ADU construction services across the Bay Area.

Our Design-Build Process

01

Consult & Feasibility

We visit the property, check the lot, utilities, panel and sewer, and confirm what your city allows: detached ADU, attached ADU, garage conversion or junior ADU.

02

Design & Permits

Floor plans, 3D design previews and a detailed estimate, then structural and Title 24 drawings, submittal and plan check through permit issuance.

03

Build & Final Inspection

Our team builds the foundation, framing, utilities, insulation and finishes, then closes out the permit with the city and walks you through the finished ADU.

Area We Serve: San Francisco | Palo Alto | Menlo Park | Atherton | Mountain View | Sunnyvale | Los Altos Hills | Belmont | Redwood City | San Mateo | Pacifica | Hillsborough | San Carlos | Woodside | Portola Valley | Saratoga | Los Gatos | Cupertino | San Jose | Santa Clara | Daly City | San Bruno | Millbrae | Burlingame | Los Altos | Campbell | Milpitas | Brisbane | Foster City

/ FAQ

Frequently Asked Questions

If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help.

Yes. ADUs are allowed on lots zoned for single-family or multifamily use, including the R-1, R-D, R-M, R-1D, HR and RC zones, and are approved without a public hearing.

Often not. Parking is not required near transit, in historic districts, for conversions or for junior ADUs, and a converted garage does not need replacement parking.

Scroll to Top