Los Gatos allows ADUs of up to 1,200 square feet with no limit on bedrooms, and an ADU of up to 800 square feet is exempt from the Town’s floor area limits. Design by M&M designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across Los Gatos, with 22+ years of experience, 1,000+ completed projects and CSLB license #1082131.
Los Gatos ranges from historic homes near downtown to large hillside lots in the HR and RC zones. The right ADU depends on your zone, slope, trees and how you plan to use the space.
A standalone backyard home of up to 1,200 square feet, with its own kitchen, bathroom and entrance. It must sit behind the main house, at least five feet from other buildings.
An addition to the main house with its own entrance and full kitchen, up to 25 feet tall or the zone’s height limit.
Converting an existing garage reuses the walls, roof and slab, and the lost parking does not have to be replaced. See our guide to garage conversions in Los Gatos.
Up to 500 square feet inside the existing home, with an efficiency kitchen and its own entrance. A junior ADU counts toward the home’s allowed floor area and needs no parking.
Need more room for your own household rather than a separate unit? A room addition in Los Gatos may be the better fit, and the two can often be planned together.
State ADU law sets the baseline, and the Town of Los Gatos applies its own standards on top. These are the rules that shape most projects:
Rules change and every lot is different, so we confirm current requirements with the Town of Los Gatos and Santa Clara County Fire before design is finalized. For background on unit types, see our guides to detached ADUs and junior ADUs.
Plan for three phases. Design and engineering come first, along with fire department coordination. Town review follows, and state law requires a decision within 60 days of a complete application. Construction length depends on the ADU type: a garage conversion is usually the fastest, and a new detached unit takes the longest. We give you a schedule for all three phases at the start. Design by M&M handles design, engineering, permits and construction under one contract, so you work with one team from the first site visit to the final inspection.
Learn more about our ADU construction services across the Bay Area.
We visit the property, check the lot, utilities, panel and sewer, and confirm what your city allows: detached ADU, attached ADU, garage conversion or junior ADU.
Floor plans, 3D design previews and a detailed estimate, then structural and Title 24 drawings, submittal and plan check through permit issuance.
Our team builds the foundation, framing, utilities, insulation and finishes, then closes out the permit with the city and walks you through the finished ADU.
If you don’t see your question answered here, please don’t hesitate to contact us directly – we’re always happy to help.
Yes. ADUs are allowed on lots zoned for single-family or multifamily use, including the R-1, R-D, R-M, R-1D, HR and RC zones, and are approved without a public hearing.
Up to 1,200 square feet, with no limit on bedrooms. Up to 800 square feet is exempt from floor area limits. Junior ADUs are limited to 500 square feet.
Sixteen feet on most single-family lots, or 18 feet near major transit, with 2 more feet allowed to match the main roof pitch.
Behind the main house, at least four feet from the side and rear property lines and five feet from other buildings.
State law requires a decision within 60 days of a complete application. Design, fire department coordination and correction rounds come on top of that.
Often not. Parking is not required near transit, in historic districts, for conversions or for junior ADUs, and a converted garage does not need replacement parking.
If your house has sprinklers, the ADU needs them too. New construction may need them depending on access and water supply, but an ADU does not trigger sprinklers in your existing house.
Yes. In the HR and RC zones, lots with at least 12,000 square feet of slope-adjusted area get an extra 1,200 square feet of floor area for the ADU. Smaller hillside lots are calculated case by case.
Yes, ADUs can be rented long term, and we confirm current short-term rental rules with the Town during design.
Usually, yes. Most ADU work happens in the backyard or the garage. Expect short interruptions when utilities are tied in or the electrical panel is upgraded.